- Our references in 2019 -
get an idea of our work
Data center relocation
________________
industry
Retail
________________
Location
Germany
________________
number of employees
>60,000 employees
________________
Period
2019/01 - 2019/11
________________
SAP products used
ERP, F&R, CAR, SLT, EWM, PI, GK
- Sub-project management (SAP)
- transition planning
- architectural planning
- Installation / Configuration HANA
- Definition of the operational concept
- HA/DR concept
- System migration (HSR, B&R)
- performance tuning
- Creation of operating manual
- Isolation of systems for testing
________________
platform
x86 IBM Power
________________
operating system
SLES12 SP4
________________
number of systems
>70 SIDs
>90 HDBs
>200 a.s
________________
resources
>80TB RAM
>500 IBM Power Cores
>400 vCPUs on VMware
Support SAP basis / HANA operation
________________
industry
Retail
________________
Location
Germany
________________
number of employees
>60,000 employees
________________
Period
from 2019/11
________________
SAP products used
ERP, F&R, CAR, SLT, EWM, PI, GK
- maintenance
- SAP upgrades
- S/4 installations
- HANA upgrades
- installations
- performance tuning
- Troubleshoot
- Building new systems
- Integration of new architectures
- Activation of new HANA features
- constant sizing / growth analysis
- health checks
S/4 HANA 1809 Greenfield
________________
industry
IT service provider
________________
Location
Germany
________________
number of employees
>60 employees
________________
Period
2019/02 - 2019/08
________________
SAP products used
S/4HANA 1809
- Planning of the landscape including sizing
- architectural design
- Installation / Configuration HANA
- Monitoring / performance tuning (HANA Cockpit)
- Creation of operating manual
- authorization concept
- SSO via Kerberos
S/4 HANA 1909 Conversion
________________
industry
Insurance
________________
Location
Germany
________________
number of employees
>10,000 employees
________________
Period
from 2019/08 - 2021/04
________________
SAP products used
S/4HANA 1909
- Planning conversions
- Preparation for conversion
- Installation / Configuration HANA
- Execution of conversions
- rework conversion
- Monitoring / performance tuning (HANA Cockpit)
- Creation of operating manual
- authorization concept
- SSO via Kerberos
- auditing
________________
platform
Source: AIX/DB2
Target: RHEL 7.4 / HANA 2.0
________________
number of systems
>10 SIDs
________________
resources
>4TB RAM
>200 vCPUs on VMware
Architekturdesign
________________
industry
IT service provider
________________
Location
Germany
________________
number of employees
>900 employees
________________
Period
from 2019/08
________________
SAP products used
ERP, BW, HR, CRM, SLT
- solution design
- sizing
- HA/DR concept
- scalability
- Transformation of existing processes
- Workshops for knowledge transfer of new HANA features
- S/4HANA planning
- performance tuning
- Troubleshoot